The third 2-finger slug catcher delivered to this site, this slug catcher has been designed for the fasted and most cost effective installation. The wet gas inlet and dry gas outlet, usually 2 pieces, were fully welded and assembled at the TFES facility in Paola, KS. This allowed for the shipment of just (2) manifolds for the entire slug catcher.

Location: Kingfisher County, OK

Design: (1) 2 – finger Slug Catcher

Gas Flow: 325 MMSCFD

Storage: 1,500bbls

Design Pressure: 1,440 psig

Specials: Fully modular inlet Slug Catcher shipping in (2) pieces

Line Pipe: 42” API 5L

Other Project Highlights

Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.

Critical path project coordinated with companies all around the globe.

Sour service Slug Catcher.

WHY US

Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.

Integrity

We don’t compromise our practices and we won’t cut corners.

Collaboration

We take a consultative approach with customers and appreciate the big picture.

Innovation

Setting the standard requires fully understanding the box and when to think outside of it.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search