Built to minimize field work, this double downcomer assembly shipped in (3) main manifolds. The front manifold to the double downcomers significantly cuts down on fit up in the field. Delivered in <20 weeks this project helped support the aggressive project schedule set forth by the owner.
Location: Louisiana
Design: (1) 6 Finger Slug Catcher
Design Pressure: 1440psig
Gas Flow: 600 MMSCFD
Specials: Double Downcomers
Line Pipe: 42″ API 5L Line Pipe
Other Project Highlights
Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.
WHY US
Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.
Integrity
We don’t compromise our practices and we won’t cut corners.
Collaboration
We take a consultative approach with customers and appreciate the big picture.
Innovation
Setting the standard requires fully understanding the box and when to think outside of it.