Qatar Slug Catcher 2008

Inconel 625 cladded Slug Catcher for the world’s largest operating LNG facility.

Fast-tracked Permian Basin project.

Sour service Slug Catcher.

Critical path project coordinated with companies all around the globe.

One of the largest modular cladded Slug Catchers ever built.

This was a critical path project delivery (12) manifolds to (6) different compressors stations.

High pressure vessels fabricated to NASA specifications supporting the US launch programs.

High pressure vessel-type Vortex Cluster Slug Catchers fabricated to ASME Section VIII Div 2 Code.

These standard vortex tube separators are able to handle varying gas flows and can achieve >1 micron separation.

A modular Slug Catcher shipped to site in only two pieces!

A high-spec’d offshore separator vessel capable of handling extremely high pressures and volatility associated with offshore equipment.

Mission critical vessels, built to NASA specifications.

Two replacement exchangers built to precise specifications to be seamlessly installed where the originals existed.

Built to minimize field work, this double downcomer assembly shipped in (3) main manifolds.

WHY US

Taylor Forge Engineered Systems
has continued the reputation of traditionally dependable products
to a variety of industries.

Integrity

We don’t compromise our practices and we won’t cut corners.

Collaboration

We take a consultative approach with customers and appreciate the big picture.

Innovation

Setting the standard requires fully understanding the box and when to think outside of it.
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search